Search for the keyword:
            News
            Produts
            How to use the current transformer correctly?
            Proper use of current transformer

            1. The connection of current transformer should obey the principle of series connection: the primary winding resistance should be in series with the circuit under test, and the secondary winding resistance should be in series with all instrument loads.


            2. according to the magnitude of the measured current, choose the appropriate change, otherwise the error will increase. At the same time, one end of the secondary side must be grounded to prevent the high voltage of the primary side breaking into the secondary low voltage side once the insulation is damaged, causing personal and equipment accidents.


            3. The secondary side is absolutely not allowed to open circuit, because once open circuit, the primary side of the current I1 all become magnetized current, resulting in a sudden increase in PHIM and E2, resulting in excessive saturation magnetization of the core, heating serious and even burning the coil; at the same time, the magnetic circuit after excessive saturation magnetization, so that the error increases. When the current transformer is working normally, the secondary side is close to short circuit. If the secondary side is suddenly opened, the excitation EMF will suddenly change from very small value to very large value. The magnetic flux in the core presents a seriously saturated flat-top wave. Therefore, the secondary side winding will induce a very high peak wave when the magnetic field passes through zero, and the value can reach thousands. Up to 10000 volts, endangering the safety of the staff and the insulation performance of the instrument.

            In addition, one side open circuit causes the two side voltage up to several hundred volts. Once it touches, it will cause electric shock. Therefore, there are short circuit switches on the two side of the current transformer, so as to prevent the primary side from opening. In the process of using, the circuit load should be removed immediately after the two side of the circuit is opened, then the car will be stopped. Everything is handled well before it can be reused.


            4. In order to meet the needs of measuring instruments, relay protection, circuit breaker failure judgment and fault filtering, 2-8 secondary winding current transformers are installed in generator, transformer, outlet, bus segment circuit breaker, bus circuit breaker, bypass circuit breaker and other circuits. For large current grounding system, it is generally arranged in three phases; for small current grounding system, it is arranged in two or three phases according to specific requirements.


            5. The installation location of the protective current transformer should be set according to the non-protective area of the main protective device. For example, if there are two sets of current transformers, and the position permits, should be located on both sides of the circuit breaker, so that the circuit breaker in the cross protection range.


            6. In order to prevent bus failure caused by bushing flashover of pillar current transformer, current transformer is usually arranged on the outlet line of circuit breaker or transformer side.


            7. In order to mitigate the damage caused by internal faults of the generator, the current transformer used in the automatic regulating excitation device should be arranged at the outlet side of the generator stator winding. In order to facilitate the analysis and find the internal fault before the generator is merged into the system, the current transformer used for measuring instruments should be installed at the neutral side of the generator.
            Previous:Introduction to installation specification of current transformer/
            Products
            Measuring current transformer
            Metering current transformer
            Protective current transformer
            Leakage (residual) protection device
            The zero sequence current transformer
            Voltage transformer
            Transmitter
            Meter
            common problem
            How to use the current transformer correctly?
            Introduction to installation specification of current transformer
            Technical problems easy to appear in transformer test
            Case
            Contact Us

            Address: No. 555 Shenze Road, Dongxi Industrial Zone, Jinhua, Zhejiang.
            Zip code: 321017

            Tel: 0579-82235395 82235362
            Fax: 0579-82235388
            Website: www.tenttruss.com

            E-mail: aokai@okdq.cn

            主站蜘蛛池模板: 亚洲精品tv久久久久久久久久| 在线看亚洲十八禁网站| 国产人成免费视频| 国产国产人免费人成免费视频| 亚洲人妖女同在线播放| 2018天天干天天操| 欧美夫妇交换完整版随便看| 国产麻豆天美果冻无码视频| 亚洲电影一区二区三区| 久久99精品久久久久久水蜜桃| 视频精品一区二区三区| 无码人妻一区二区三区免费看 | 羽田真理n1170在线播放| 日产精品一卡2卡三卡4乱码久久| 国产超碰人人做人人爽av| 亚洲欧美日韩专区| 一级毛片在线观看免费| 精品久久人人做人人爽综合| 强行扒开双腿猛烈进入| 免费一级片网站| 999国产精品| 精品久久久久久无码人妻热| 女人把私密部位张开让男人桶| 亚洲黄色a级片| yy6080午夜一级毛片超清| 玖玖在线免费视频| 国产精品视频在| 久草网视频在线| 色聚网久久综合| 少妇激情av一区二区| 亚洲网站在线免费观看| 探花视频在线看视频| 日韩人妻潮喷中文在线视频| 国产一区中文字幕| 一区二区日韩精品中文字幕| 激情国产AV做激情国产爱| 国产精品无码永久免费888| 久久精品国产亚洲一区二区| 老司机永久免费网站在线观看| 女人18毛片免费观看| 亚洲国产精品一区二区成人片国内 |