            Introduction to installation specification of current transformer
            1 the installation of the current transformer must be firm. The exposed metal part of the transformer shell should be reliably connected.

            2 The same set of current transformers should be installed in the same direction to ensure that the primary and secondary circuit currents of the current transformers are in the same direction and the nameplate can be easily observed.

            3. The secondary side of the current transformer is not allowed to open circuit. When only one secondary circuit is used for the secondary double-turn transformer, the other secondary circuit should be reliably short-connected.

            4 the low voltage current transformer can not be grounded on the two side. Because the conductors, watt-hour meters and transformers used in low-voltage metering devices have the same insulation level, the highest voltage they can withstand is basically the same; in addition, after the secondary windings are grounded, the insulation level of the primary circuit of the whole set of devices to the ground is reduced, which makes the watt-hour meters or transformers with insulation weaknesses easy to be damaged under high voltage (such as induced lightning strikes). Bad. It is better to reduce the damage caused by lightning damage to two sides.
            Previous:Technical problems easy to appear in transformer test/ Next:How to use the current transformer correctly?
            Products
            Measuring current transformer
            Metering current transformer
            Protective current transformer
            Leakage (residual) protection device
            The zero sequence current transformer
            Voltage transformer
            Transmitter
            Meter
            common problem
            How to use the current transformer correctly?
            Introduction to installation specification of current transformer
            Technical problems easy to appear in transformer test
            Case
            Contact Us

            Address: No. 555 Shenze Road, Dongxi Industrial Zone, Jinhua, Zhejiang.
            Zip code: 321017

            Tel: 0579-82235395 82235362
            Fax: 0579-82235388
            Website: www.tenttruss.com

            E-mail: aokai@okdq.cn

            主站蜘蛛池模板: 2022欧美高清中文字幕在线看| 国产亚洲欧美在线播放网站| 亚洲熟妇无码久久精品| www.天天干| 男女性色大片免费网站| 成年人黄色毛片| 和朋友共享娇妻高hh| 中文字幕日韩精品麻豆系列| 色婷婷综合久久久久中文字幕| 日本一区二区三区在线观看| 国产剧情一区二区| 久久国产小视频| 蜜桃97爱成人| 成人综合激情另类小说| 医生系列小说合集| mm1313亚洲国产精品美女| 狠狠色综合网站久久久久久久| 大陆三级午夜理伦三级三| 亚洲精品美女久久777777| 91成人高清在线播放| 欧美伦理三级在线播放影院| 国产精品igao视频网网址| 国产思思99re99在线观看| 九九在线中文字幕无码| 韩国二级毛片免费播放| 成在线人免费无码高潮喷水| 六月天丁香婷婷| 99在线精品视频在线观看| 波多野结衣办公室| 国产精品天天干| 久久精品国产精品国产精品污| 被两个同桌绑起来玩乳动态gif| 扒开双腿疯狂进出爽爽动态图| 出差被绝伦上司侵犯中文字幕| 99在线视频免费| 欧洲美熟女乱又伦免费视频| 国产午夜鲁丝片AV无码免费| 丝袜高跟浓精受孕h文| 玉蒲团2之玉女心经| 国产精品一区91| 久久久精品2019中文字幕之3|